Here, the outside form has been set up. You will Notice the window and door frames have been installed. Next trusses and steel are installed next to the outside form.
Note: There must be a tie at every pin and a truss on every tie to hold the foam. Trusses must connect on both side of foam.
To the left installation of foam, trusses and steel are pictured. When this process is done, the electricians and plumbers rough in the job. Once complete inside form is set. Walls are ready to pour.
|