Understanding and installing Thermal Wall Technology
Here, the outside form
has been set up. You
will Notice the window
and door frames have
been installed. Next
trusses and steel are
installed next to the
outside form.

Note: There must be a
tie at every pin and a
truss on every tie to
hold the foam.
Trusses must connect
on both side of foam.

To the left installation
of foam, trusses and
steel are pictured.
When this process is
done, the electricians
and plumbers rough
in the job. Once
complete inside form
is set. Walls are ready
to pour.
Truss-sizes are
precut for three foot
panels. Trusses
slide in one side
then the other. On
panels less than 3'
bolt cutters are
needed for truss
adjustments.